Display:
I don't want to join the reservoirs by pipes at the bottom as then a small leak that form might encourage a larger leak, and continously put out water. The last tube with the float should really be linked by the top as well, and have a tiny hole at the bottom. Then the water starts up every now and again, ensuring everything is filled, the final tube fills up, the stop switch is triggered, and the last tube empties slowly, expelling a small amount of liquid. The system is then ready to go for the next fillup.
by someone (s0me1smail(a)gmail(d)com) on Sat Mar 15th, 2008 at 03:22:42 PM EST
[ Parent ]
Eh? A toilet valve is at the top of the reservoir. Just link them all at the top level.
by Colman (colman at eurotrib.com) on Sat Mar 15th, 2008 at 03:25:41 PM EST
[ Parent ]
Putting the toilet valve in the last one? Then there is an issue that the containers earlier in the chain may empty first and the refill not be triggered in the last one until too late. This may not be an actual problem, just one I imagine.
by someone (s0me1smail(a)gmail(d)com) on Sat Mar 15th, 2008 at 03:30:45 PM EST
[ Parent ]
First one, where the water enters the system.
by Colman (colman at eurotrib.com) on Sat Mar 15th, 2008 at 03:32:24 PM EST
[ Parent ]

Display:
Login
. Make a new account
. Reset password
Occasional Series