British, American and Norwegian engineers are in a race to design and build the holy grail of wind turbines - giant, 10MW offshore machines twice the size and power of anything seen before - that could transform the global energy market because of their economies of scale.Today, a revolutionary British design that mimics a spinning sycamore leaf and which was inspired by floating oil platform technology, entered the race. Leading engineering firm Arup is to work with an academic consortium backed by blue-chip companies including Rolls Royce, Shell and BP to create detailed designs for the "Aerogenerator", a machine that rotates on its axis and would stretch nearly 275m from blade tip to tip. It is thought that the first machines will be built in 2013-14 following two years of testing.
British, American and Norwegian engineers are in a race to design and build the holy grail of wind turbines - giant, 10MW offshore machines twice the size and power of anything seen before - that could transform the global energy market because of their economies of scale.
Today, a revolutionary British design that mimics a spinning sycamore leaf and which was inspired by floating oil platform technology, entered the race. Leading engineering firm Arup is to work with an academic consortium backed by blue-chip companies including Rolls Royce, Shell and BP to create detailed designs for the "Aerogenerator", a machine that rotates on its axis and would stretch nearly 275m from blade tip to tip. It is thought that the first machines will be built in 2013-14 following two years of testing.
Britain's offshore wind ambitions will face a £10bn funding gap within five years, energy experts will warn today, and the Government's legally-binding 2020 green targets will not be met unless the deficit can be closed. This comes a day after Energy Minister Chris Huhne revealed plans for a huge expansion of the UK's wind turbines, saying wind power would be an "important part" of meeting the country's energy demands in the future. A whopping £30bn of capital investment in offshore wind farms is needed over the coming decade if the UK is to produce the 30 per cent of electricity from renewable sources needed to comply with European regulations, according to the report from consultancy PricewaterhouseCoopers (PwC).
Britain's offshore wind ambitions will face a £10bn funding gap within five years, energy experts will warn today, and the Government's legally-binding 2020 green targets will not be met unless the deficit can be closed.
This comes a day after Energy Minister Chris Huhne revealed plans for a huge expansion of the UK's wind turbines, saying wind power would be an "important part" of meeting the country's energy demands in the future.
A whopping £30bn of capital investment in offshore wind farms is needed over the coming decade if the UK is to produce the 30 per cent of electricity from renewable sources needed to comply with European regulations, according to the report from consultancy PricewaterhouseCoopers (PwC).
A whopping £30bn of capital investment in offshore wind farms is needed
This is a job for Superman (a Paris) keep to the Fen Causeway