Filling the tunnel mouth with concrete will happen at decommissioning sometime after 2100. Are we even going make it till then? You have to hope and plan.

People could accidentally encounter the tunnel without drilling through the concrete. It is possible to dig hundreds of meters without advanced industrial equipment, without knowing anything about radioactivity. Very unlikely but possible. It's the time span that makes the whole project incomprehensible.