Tokyo Electric Power Co. said Saturday that a cracked storage pit at the Fukushima No. 1 power plant was the source of a radioactive water leak contaminating the ocean and that it is attempting to fill it with concrete. According to the utility and the Nuclear and Industrial Safety Agency, the square, concrete-covered pit is situated near an intake used to pump seawater into reactor No. 2. Although the pit is small, it contains highly contaminated water with a radioactivity exceeding 1,000 millisieverts per hour that is leaking into the ocean from a 20-cm crack, Tepco said. The pit, which is 1.2 meters x 1.9 meters and 2 meters deep, is usually used to store cables. But it is also connected directly to the reactor building through a cable trench, raising the possibility that the source of the contaminated water is the reactor itself, a NISA official said. The cable trench is different from the pipe trench at No. 2, where water with the same level of radioactivity was discovered Monday. Although the two trenches are connected, no water has been found in the cable trench because it is at a higher elevation, the official said. How much water has leaked and for how long were not known as of Saturday afternoon.
According to the utility and the Nuclear and Industrial Safety Agency, the square, concrete-covered pit is situated near an intake used to pump seawater into reactor No. 2.
Although the pit is small, it contains highly contaminated water with a radioactivity exceeding 1,000 millisieverts per hour that is leaking into the ocean from a 20-cm crack, Tepco said.
The pit, which is 1.2 meters x 1.9 meters and 2 meters deep, is usually used to store cables. But it is also connected directly to the reactor building through a cable trench, raising the possibility that the source of the contaminated water is the reactor itself, a NISA official said.
The cable trench is different from the pipe trench at No. 2, where water with the same level of radioactivity was discovered Monday. Although the two trenches are connected, no water has been found in the cable trench because it is at a higher elevation, the official said.
How much water has leaked and for how long were not known as of Saturday afternoon.
by ARGeezer - May 24 4 comments
by DoDo - May 23 41 comments
by DoDo - May 25 1 comment
by Nomad - May 10 14 comments
by JakeS - May 15 7 comments
by Metatone - May 14 85 comments
by ARGeezer - May 16 15 comments
by gmoke - May 17 2 comments
by DoDo - May 251 comment
by ARGeezer - May 244 comments
by DoDo - May 2341 comments
by gmoke - May 172 comments
by ARGeezer - May 1615 comments
by JakeS - May 157 comments
by Metatone - May 1485 comments
by DoDo - May 1211 comments
by Nomad - May 1014 comments
by Migeru - May 78 comments
by marco - May 782 comments
by Migeru - May 6100 comments
by Ted Welch - May 35 comments
by afew - May 341 comments
by ceebs - May 26 comments
by gmoke - Apr 301 comment
by Frank Schnittger - Apr 3067 comments
by joelado - Apr 2954 comments
by Metatone - Apr 2854 comments
by ATinNM - Apr 275 comments