The Kildare National Roads Design Office is proposing to build a new motorway standard road from Tallaght to Hollywood in west Wicklow (Population 500)  through some of the most scenic countryside in Ireland in the Slade Valley, Blessington Lake and Glen Ding areas. Ordinarily one would welcome any proposal that would generate even temporary employment in these troubled times and there is no denying that existing roads need upgrading particularly at Jobstown, the Embankment, Crooksling and Brittas.

However traffic volumes have been falling along the route in recent years partly due to the end of the boom, but also due to the fact that many quarries along the route are nearing the end of their productive lives. Although the Phase 2 route selection proposals just published for public consultation now thankfully avoid the immediate environs of Blessington Lake, they will still be very destructive of existing homes and farms and will remove even more of what is left of the Glen Ding hill and woodland overlooking Blessington.

This is despite the fact that the inner relief road within Blessington was never completed to connect to the N81 at roundabouts north and south of the town and has been grossly under-utilised as a result. It cannot be effectively used as a bypass of the town because there is no right turning lane or roundabout for it travelling south on the N81 at Blessington, and the onward connection back to the N81 south of the town was never built.

There simply is no need for an additional motorway standard road around and beyond Blessington because traffic volumes are falling, and Hollywood, Baltinglass (population 2,000 and distance 30 KM), and Tullow (Population 3,000 and distance 50 KM) are the only towns further along the route and even these are not included in the National Spatial Strategy as population growth centres. Indeed the Tullow area is already served by the M9 motorway for travellers or heavy goods vehicles who want to get to Dublin in a hurry.

All the possible routes proposed for the new motorway are convoluted and much longer than the existing N81 and will thus be of benefit to very few travellers. Most will simply continue to use the existing N81 which, with a few junction improvements and minor upgrades and an extension of the Blessington inner relief road is more than adequate for any realistic projections of future traffic levels.

The motorway proposal is a hangover from the Celtic Tiger era when there were inflated population, economic and traffic growth expectations, oil was plentiful and cheap, and carbon footprints were almost unheard of. It is time our planning systems took account of our changed economic circumstances and we started planning more useful, sustainable and cost effective projects.

If we do want to dramatically improve our public transport infrastructure, an extension of the Luas beyond Saggart to the Naas/Blessington area would be a good start. After all Blessington did have its own tram service until 1932.

Index of Frank's Diaries

by Frank Schnittger (mail Frankschnittger at hot male dotty communists) on Fri Jul 15th, 2011 at 09:17:55 AM EST
[ Parent ]

Others have rated this comment as follows:

afew 4
JakeS 4

Display: