Installations are strong despite, or just because of, the feed-in law revision jitters: 4.4 GW in the first half year, of which 1.8 GW in June alone. With that, total capacity climbed to 29 GW, so it is likely that wind will be surpassed capacity-wise by the end of the year (but not production-wise, due to the lower capacity factor).