Considering the Leeds-Manchester-Liverpool line seems to be a no-brainer and potentially the most sensible of all major rail links in the country, I decided to check nationalrail.co.uk to see what the situation is like at present.
The fastest direct train takes 1h47 minutes, while we know it could take as little as 27 minutes non-stop and less than 40 minutes with a stop in Manchester. At nearly 2h travel time it almost makes sense to fly from Leeds to Liverpool, but a good rail connection via Manchester would such the airlines dry of their market share. We have met the enemy, and it is us — Pogo
OK, Leeds, Manchester, 14 miles in 20 minutes, 30 miles at 100mph so about 18 minutes, for a total of 38 minutes.
Manchester, Liverpool, 14 miles in 20 minutes, 21 miles at 100mph, is about 13 minutes, for about 33 minutes.
10 minutes for debarking and embarking at Manchester, and eventually arriving after an HSR London/Birmingham/Manchester arrives and before it returns, would yield 1 hour 21 minutes.
Non-stop Leeds/Liverpool, 14 miles in 20 minutes, 59 miles in 39 minutes, 59 minutes. I've been accused of being a Marxist, yet while Harpo's my favourite, it's Groucho I'm always quoting. Odd, that.
The DfT states that their involvement in a future fleet specification and acquisition is necessary for several reasons. Though Britain's rail operators are privatised, their franchises seldom last for more than 12 years; a train, on the other hand, may remain in service for more than 30 years. It is therefore entirely unprofitable for the franchise operator to replace the fleet, leaving the only other option to hire newly acquired trains from third parties, which can prove extremely expensive. The DfT also states that it can, and has, brought train operators together with a `whole system, whole life' perspective to decide on a specification that will be more flexible with regards to future routes and fleet transfers as well as more environmentally aware.
Say what? We have met the enemy, and he is us — Pogo
But it looks like the key there is conventional Non-Stop / Express / Local scheduling with the Non-Stop chasing the Express chasing the Local into Manchester (on either side).
Assuming 125mph and working that through again ...
Leeds, Manchester, 14 miles in 20 minutes, 30 miles at 125mph so about 15 minutes, for a total of 35 minutes.
Manchester, Liverpool, 14 miles in 20 minutes, 21 miles at 125mph, is about 10 minutes, for about 30 minutes.
10 minutes for debarking and embarking at Manchester, and eventually arriving after an HSR London/Birmingham/Manchester arrives and before it returns, would yield 1 hour 1:15 minutes, so not the same improvement as :145 to 1:20.
Non-stop Leeds/Liverpool, 14 miles in 20 minutes, 59 miles in 29 minutes, 49 minutes.
Not surprisingly, the bonus for a slight ratcheting up of the speed of the class 43 is is the Leeds/Liverpool non-stop.
But to me, the linchpin there for the regional transport task is a true HSR line London/Birmingham/Manchester, and Non-Stop / Express / Locals chasing each other into Manchester to connect with the HSR. However, if it is possible to get an effective Dublin connection by ferry from Liverpool, then I can see taking a London/Birmingham/Manchester HSR on into Liverpool. I've been accused of being a Marxist, yet while Harpo's my favourite, it's Groucho I'm always quoting. Odd, that.
by Frank Schnittger - Jan 22 3 comments
by Cat - Jan 25 17 comments
by Frank Schnittger - Jan 26
by Oui - Jan 9 21 comments
by Frank Schnittger - Jan 13 28 comments
by gmoke - Jan 20
by Oui - Jan 15 90 comments
by gmoke - Jan 7 13 comments
by Oui - Jan 2716 comments
by Cat - Jan 2517 comments
by Frank Schnittger - Jan 223 comments
by Oui - Jan 219 comments
by Oui - Jan 21
by Oui - Jan 20
by Oui - Jan 1839 comments
by Oui - Jan 1590 comments
by Oui - Jan 144 comments
by Frank Schnittger - Jan 1328 comments
by Oui - Jan 1212 comments
by Oui - Jan 1120 comments
by Oui - Jan 1031 comments
by Oui - Jan 921 comments
by NBBooks - Jan 810 comments
by Oui - Jan 717 comments
by gmoke - Jan 713 comments
by Oui - Jan 68 comments