The European Tribune is a forum for thoughtful dialogue of European and international issues. You are invited to post comments and your own articles.
Please REGISTER to post.
I've helped unload one of these, when I was working in the warehouse. I've been accused of being a Marxist, yet while Harpo's my favourite, it's Groucho I'm always quoting. Odd, that.
On the loading gauge aspect:
Given the way that the Roadrailers carry their road tires a short distance above the rail, there is no way any piggyback with the tires sitting on a rail car can fit inside the same railway loading gauge with the same interior cargo height as a RoadRailer. And a Roadrailer would be designed for the ruling loading gauge of the network it runs on. Any piggyback trailer with the same capacity per length, will be higher than an equivalent Roadrailer, or conversely any Roadrailer with the same external height above the rail as an equivalent piggyback will have a greater capacity per length.
The Railrunner is not a normal Roadrailer, its a chassis for a standard container that converts it into a road railer. The bogie is a separable unit that replaces the semi truck with a rail truck, but that is how the newest Roadrailers do it as well ~ the original Roadrailers of the 1950's had bogies that lifted up out of the way when on the road and then were dropped down and locked into place to carry the trailer on the tracks, but a separate bogie is the more effective solution ~ if you normally send the truck out and then it returns to the same railhead, carrying the bogie as deadweight there and back is not the most effective solution. Also, that allows a single rail coupling bogie on either end of a string and a specialized inter-trailer bogie in between the trailers in the string.
The Railrunner would be a more comfortable fit for the CargoSprinter type of system, though, since the control pass through between lead motor unit and trailing motor units could be built into the chassis and the connection tested in-cab when the consist is marshalled.
The highest profile Roadrailer service in the US is the Triple Crown, established in the 1980's by the Norfolk Southern and since the 90's joined by BNSF to include service between Kansas and Texas. I've been accused of being a Marxist, yet while Harpo's my favourite, it's Groucho I'm always quoting. Odd, that.
That's what I compared, too (with a typo: should be 9" for Terminal Anywhere, not 9'): whether the semi-trailer carries containers or not is not the issue here. (I couldn't find figures or drawings to estimate the lifting height of normal Roadrailers.) Lifting 230 mm above rail is not that much, and it actually appears somewhat less in practice due to the difference from spring suspension and tire deformation of the trailer road wheels (and possibly also because it appears as if the front part of the trailer is lifted less, something like 2").
Can you find figures on RoadRailer lifting heights? The Wikipedia photo appears to show a lower lifting height than Terminal Anywhere (my rough visual estimate is 150 mm), but it's not clear to me whether the other end of the trailer is lifted already.
the original Roadrailers of the 1950's had bogies that lifted up out of the way when on the road
There is a modern version, too: American Surface Lines' RailMate, but I suspect anything with deadweight carried around is a stillborn idea. *Lunatic*, n. One whose delusions are out of fashion.
I'd assume that the separate bogies are also worth some increase in top speed.
Here's an almost end-on view of a Triple Crown Roadrailer consist: I've been accused of being a Marxist, yet while Harpo's my favourite, it's Groucho I'm always quoting. Odd, that.
The chassis means that the bottom internal floor of the container is higher above the rail than with the original Roadrail approach, but for standard containers & singlestack, clearances are not such an issue.
When just replacing piggyback, there isn't a separate chassis, just a bogie holding up the trailer, with the trailer specialized for running in both modes, and the internal floor of the freight trailer is closer to the tracks than with any piggyback railcar. I've been accused of being a Marxist, yet while Harpo's my favourite, it's Groucho I'm always quoting. Odd, that.
Are you sure we are talking about the same thing? On the official site of RailRunner, all photos and graphs of the Terminal Anywhere system show a bi-modal system consisting of semi-trailers specialized for running in both modes (chassis with road wheels and fifth wheel coupler on and with specialised ends for railroad mode) and bogies only. The only difference seems to be that in Terminal Anywhere the trailer is lifted by being pushing up a slide on the bogie, while if I read my sources right, in classic RoadRailer the trailer is raised by active operation of its suspensions. Here is a RailRunner video showing both the jacking-up and jacking-down of a semi-trailer on the bogie:
It doesn't appear to be any higher than a standard North American semi-trailer or a Triple Crown trailer, either,having similar fifth wheel heights and being 13,5' high when loaded with a high-cube container (which would be 11 cm higher than a standard European semi-trailer, however, so they'll need to modify the trailers if their tentative European export plans are to come to anything).
BTW, what is the top speed of classic Roadrailers on rail?
closer to the tracks than with any piggyback railcar.
Quite likely, but by how much? 50 mm, 100 mm, 150 mm? Again, do you have any figures on the wheeled end lifting height? I again couldn't find any, even with the Triple Crown help. Here I find a good side view, but the 135 mm I estimate between road wheel and rail (based on the trailer interior height data) isn't really useful. *Lunatic*, n. One whose delusions are out of fashion.
Are you sure we are talking about the same thing? On the official site of RailRunner, all photos and graphs of the Terminal Anywhere system show a bi-modal system consisting of semi-trailers specialized for running in both modes (chassis with road wheels and fifth wheel coupler on and with specialised ends for railroad mode) and bogies only.
Indeed, if there is a more "rounded" loading gauge in the target network, the top of the Roadrailer trailer could be made higher and the freight capacity larger by putting the top higher than a rectangular box will allow, and slanting the sides near the top.
Now, I presume that the Roadrailer is designed within the AAR standard loading gauge, but so long as it fits within the STRACNET loading gauge:
... if there is a loading gauge constraint on some shortline between the STRACNET corridor and the origin/destination loading dock, it can just hit the road.
Railrunner may well have to work through European loading gauge issues if they are aiming for the European market. Its not likely to be a binding constraint for them given the standard AAR loading gauge to work with. A conventional Roadrailer would not be the same challenge, as you just design the trailer dimensions to suit the target market. I've been accused of being a Marxist, yet while Harpo's my favourite, it's Groucho I'm always quoting. Odd, that.
IMHO the limiting factors in a US context are not AAR- but road-related: the 13.5' outer height limit and the standardised 47-49" fifth wheel height. So the front end external height of the cargo-holding structure cannot be larger than 115". A high-cube container is 114". So what about the inside? Checking figures, high-cube container internal height is 106", while Triple Crown dry vans have an inside height of 110" at the front and 112.25" in the rear. So in effect the 4" thick bottom of the container (about 10 cm) and a slope 2.25" high at the end is what's gained.
If RailRunner (or any new RoadRailer version) comes to Europe, they'll need to lower their stuff by about 10 cm to fit roads, but fortunately that won't reduce the cargo height: both the road vehicle height limit (4 m or about 13'2") and the standard fifth wheel heights (seem to be between 950 and 1,150 mm, or about 37" and 45") are lower.
if there is a more "rounded" loading gauge in the target network, the top of the Roadrailer trailer could be made higher
If a trailer is designed to fit the rounded corners of older railway loading gauges in Europe, then it will have a smaller capacity than a standard road trailer while already being more expensive as a special rail-ready construction, and thus be at a disadvantage. *Lunatic*, n. One whose delusions are out of fashion.
IMHO the limiting factors in a US context are not AAR- but road-related
If a trailer is designed to fit the rounded corners of older railway loading gauges in Europe, then it will have a smaller capacity than a standard road trailer while already being more expensive as a special rail-ready construction, and thus be at a disadvantage.
As DoDo says, more conventional piggyback systems, therefore able to be loaded from various points in continental Europe, are in the process of being established. But that seems like its still treating freight across Britain as a last mile problem. I've been accused of being a Marxist, yet while Harpo's my favourite, it's Groucho I'm always quoting. Odd, that.
The Modalohr system looks to allow conventional piggyback freight of general purpose trailers. Remember that I was a teenager in the 70's, so I think of piggyback freight as the "conventional" multi-modal that was so commonplace in the 70's, and container rail / road / ship / barge as the more modern approach that has grown so much over the past forty years.
Train to train? Should containers or truck trailers be moved for train to train? In an efficient system, all train to train movements will be coupling and uncoupling strings of freight cars. The Cargosprinter is the ultimate for that of course ...
... and at the volume of a single CargoSprinter one could load and unload containers with a forklift. And two Cargosprinter consists could run a string of Roadrailers in between, for very flexible carload freight handling abilities. Obviously either a Modalohr or the sliding system could be part of the railcar consist between the end CargoSprinter, but first the Modalohr needs to be rolled out to its major intermodal transfer gateways before it starts to make sense to extend it to smaller railheads. I've been accused of being a Marxist, yet while Harpo's my favourite, it's Groucho I'm always quoting. Odd, that.
It also would fit the CargoSprinter concept perfectly, since an entire Cargosprinter could be loaded at once. I've been accused of being a Marxist, yet while Harpo's my favourite, it's Groucho I'm always quoting. Odd, that.
So far, there are only point-to-point liaisons, with no intermediate stops.
Here's some news you might not have seen : the Perpignan-Luxemburg Modalohr service is to be extended to Sweden, and into Spain :
Rail motorways to serve Spain and Sweden - Railway Gazette
22 June 2012 EUROPE: Announcing the rebranding of its 'rail motorway' business as VIIA on June 7, SNCF Geodis said that its Perpignan - Luxembourg service is to extended to Helsingborg in Sweden later this year. A southern extension into Spain is also being planned, following the successful conclusion of initial cross-border tests to Llers on June 3. The Perpignan - Luxembourg service carried 50 000 semi-trailers and swap bodies in 2011, with the increase in maximum train lengths to 850 m providing a 33% increase in capacity on the four daily return trips. With the Mont Cenis tunnel between France and Italy cleared to the GB1 loading gauge, VIIA's Aiton - Orbassano service is now able to accept standard semi-trailers and it is hoped to grow traffic by 40% or 'around 10 000 extra transport units a year'. 'Rail motorways are on their way to forming a real network', said SNCF Geodis Finance Director Olivier Storch. 'The recent introduction of the longest train in Europe reflects a renewal of rail and proves rail's ability to adapt to customer expectations on service, costs, reliability and CO2 emissions.'
EUROPE: Announcing the rebranding of its 'rail motorway' business as VIIA on June 7, SNCF Geodis said that its Perpignan - Luxembourg service is to extended to Helsingborg in Sweden later this year. A southern extension into Spain is also being planned, following the successful conclusion of initial cross-border tests to Llers on June 3.
The Perpignan - Luxembourg service carried 50 000 semi-trailers and swap bodies in 2011, with the increase in maximum train lengths to 850 m providing a 33% increase in capacity on the four daily return trips.
With the Mont Cenis tunnel between France and Italy cleared to the GB1 loading gauge, VIIA's Aiton - Orbassano service is now able to accept standard semi-trailers and it is hoped to grow traffic by 40% or 'around 10 000 extra transport units a year'.
'Rail motorways are on their way to forming a real network', said SNCF Geodis Finance Director Olivier Storch. 'The recent introduction of the longest train in Europe reflects a renewal of rail and proves rail's ability to adapt to customer expectations on service, costs, reliability and CO2 emissions.'
As a result of EUsterity, Portugal has cancelled the project to build high speed rail from Lisbon to the Spanish border, which has provided Spain with the excuse to do the same, so no Lisbon-Madrid high speed rail link. If you are not convinced, try it on someone who has not been entirely debauched by economics. — Piero Sraffa
The official excuse though was some untowardness in the PPP tendering process, and the excuse for not re-launching the tender included the claim that the priority is a normal-gauge freight link to the Spanish network.
provided Spain with the excuse to do the same
Do you have a source? Last I heard was Spain considering to sue Portugal for not respecting an international agreement, and Brussels intervening to negotiate a compromise solution. Some parts of the line on the Spanish side are almost completed (albeit just the parts furthest from Madrid). *Lunatic*, n. One whose delusions are out of fashion.
Adif finaliza las obras de plataforma en el tramo Mérida-Badajoz - ADIF
...Las obras de la línea de alta velocidad a su paso por Extremadura se dividen en 20 subtramos, de los que 10 se encuentran en fase de obras: Talayuela-Arroyo de Santa María, Navalmoral de la Mata-Casatejada, Grimaldo-Casas de Millán, Casas de Millán-Cañaveral, Cañaveral-Embalse de Alcántara, Embalse de Alcántara-Garrovillas, Garrovillas-Casar de Cáceres, Casar de Cáceres-Cáceres, Cáceres-Aldea del Cano y Aldea del Cano-Mérida. La longitud total de estos subtramos, incluyendo los dos ya finalizados, asciende a 136 km.
Which, if I decoded it right, says that earthworks are complete on the Mérida-Badajoz section, and on the entire part of the line in Extramadura province, work is on-going on ten more of the 20 sections, for a combined 136 km. Cancelling the line in Spain would be more 'serious' than the Portuguese cancellation because work on these in-construction sections would have to stop and contractors be left unpaid. I suspect austerity willcontinue to kick in here via the continued delay of the tendering of the construction of the rest of the sections (and of the tracks). *Lunatic*, n. One whose delusions are out of fashion.
Checking on the figures, 550 m corresponds to 14 wagons, which are twin articulateds, so the range seems to be from 18 complete semi-trailer truck units (with 18 half-cars carrying the semi-trailers and 9 the road trucks) to 28 unaccompanied semi-trailers.
in half an hour
That's the unload-plus-reload time. *Lunatic*, n. One whose delusions are out of fashion.
Still, its one facility in the UK for loading / unloading entire trains of piggyback freight, rather than the kind of system where you could have hundreds of railheads distributed across the UK. I've been accused of being a Marxist, yet while Harpo's my favourite, it's Groucho I'm always quoting. Odd, that.
*Lunatic*, n. One whose delusions are out of fashion.
EUROPE: Announcing the rebranding of its 'rail motorway' business as VIIA on June 7, SNCF Geodis said that its Perpignan - Luxembourg service is to extended to Helsingborg in Sweden later this year. A southern extension into Spain is also being planned, following the successful conclusion of initial cross-border tests to Llers on June 3. The Perpignan - Luxembourg service carried 50 000 semi-trailers and swap bodies in 2011, with the increase in maximum train lengths to 850 m providing a 33% increase in capacity on the four daily return trips.
I don't want to quote the entire article, so I paraphase another part related to something discussed upthread, loading gauges: they mention the modification of the tunnel at the France/Italy border for the extended GB1 profile.
Further routes are planned:
Isn't there a tunnel connecting to the rest of europe?
What do you mean, "the rest of Europe"? There is a trans-atlantic tunnel from Dover to Calais. It is rightly acknowledged that people of faith have no monopoly of virtue - Queen Elizabeth II
Not to mention the effects of underfunded state railways and the EU push for "liberalisation". In the past year, Bulgaria was de-facto blackmailed by the Commission to privatise the freight branch of the national railways. *Lunatic*, n. One whose delusions are out of fashion.
by gmoke - Nov 30
by gmoke - Nov 24
by gmoke - Nov 7
by gmoke - Nov 11
by Oui - Jan 17
by Oui - Jan 16
by Oui - Jan 15
by Oui - Jan 151 comment
by Oui - Jan 14
by Oui - Jan 141 comment
by Oui - Jan 132 comments
by Oui - Jan 13
by gmoke - Jan 138 comments
by Oui - Jan 12
by Oui - Jan 122 comments
by Oui - Jan 11
by Oui - Jan 112 comments
by Oui - Jan 10
by Oui - Jan 101 comment
by Oui - Jan 9
by Oui - Jan 8
by Oui - Jan 83 comments